continuous improvement chez moi

Oct 03

[video]

Finishing the Path

Finishing the Path

Apr 16

The only shot of the pain which was Easter weekend

The only shot of the pain which was Easter weekend

Apr 15

The metal is in, in anticipation of the concrete pour in the morning

The metal is in, in anticipation of the concrete pour in the morning

Mar 31

The Roadbase went in back in September!

The Roadbase went in back in September!

Dec 30

The Rainwater Tank is in!

The Rainwater Tank is in!

Oct 25

[video]

Sep 30

The Roadbase and Drainage is in. At this rate it’ll al be done by the time Sally gets grey hairs. Working on extending the Drainage Channel into the Garden now

The Roadbase and Drainage is in. At this rate it’ll al be done by the time Sally gets grey hairs. Working on extending the Drainage Channel into the Garden now

Jul 18

And the chaos under the house. Lowering the floor by 40-45 cm to have around 2m. Also putting in a shower and a big rain water tank.

And the chaos under the house. Lowering the floor by 40-45 cm to have around 2m. Also putting in a shower and a big rain water tank.

The chaos down the side of the house awaiting a
Plumber to
Move the water pipe before I can lay a path

The chaos down the side of the house awaiting a Plumber to Move the water pipe before I can lay a path